Karun Airlines NV2690 Flight Status from Ahwaz to Dubai, United Arab Emirates today

International flight Karun Airlines NV2690 from Ahwaz (AWZ) Iran to Dubai (DXB) United Arab Emirates operated by Karun Airlines. Scheduled time of departure from Ahwaz Airport is 09:00 Asia/Tehran and scheduled time of arrival in Dubai Airport is 10:30 Asia/Dubai. The duration of the flight is 60 minutes.

NV2690 - IRG2690 Karun Airlines (NV)
AWZ Ahwaz Iran
Flight AWZ to DXB
DXB Dubai United Arab Emirates
NO FLIGHTS IN THE LAST 14 DAYS Lasted record on 24-July-2018
Departure Ahwaz Airport
IATA: AWZICAO: OIAW
Scheduled 09:00
Arrival Dubai Airport
IATA: DXBICAO: OMDB
Scheduled 10:30
2
NV2690 Detail
  • Type: International Flight
  • Flight Duration: 60 minutes
  • Flight Distance: 936 kms / 581 miles
Airline
  • Karun Airlines
  • IATA: NV
  • ICAO: IRG
  • Operating Days: Monday, Tuesday, Wednesday, Thursday, Friday, Saturday, Sunday
Passenger Services
  • Service type: Normal passenger
  • Seats: 100
  • Freight capacity: 5.1 tons
  • Passenger classes: Economy
More Detail
  • Aircraft: 100
  • Callsign: IRG2690
  • Departure Timezone: Asia/Tehran
  • Arrival Timezone: Asia/Dubai
  • Current Time in Ahwaz: Thursday 2024-04-25 17:44 PM
  • Current Time in Dubai: Thursday 2024-04-25 18:14 PM

Similar flight route from Ahwaz (AWZ) to Dubai (DXB)

Airline Flight no Departure Arrival
Iran Air IR648
Iran Air
25/04/2024
11:35 (+3.5:30)
1 hours 50 minutes
13:55 (+4:00)
Sky Georgia QB2252
Sky Georgia
25/04/2024
8:00 PM (+3.5:30)
1 hours 55 minutes
9:40 PM (+4:00)
Flydubai FZ260
Flydubai
25/04/2024
16:30 (+3.5:30)
1 hours 55 minutes
17:55 (+4:00)

Frequently asked questions, answered

How long is the flight from Ahwaz to Dubai?

On average, nonstop flight takes 60 minutes, with the flight distance of 936 km (581 miles).

What type of aircraft is used for the Karun Airlines NV2690 flight?

All Karun Airlines NV2690 flights are operated using 100 aircraft.

Which terminal the flight Karun Airlines NV2690 is arriving at?

Flight Karun Airlines NV2690 arrives in Dubai Airport at Terminal 2.